BUILDING FOR BEAUTY AND ETERNITY
other

Products

Home /

Steel Structure System

/

Portal Frame Steel Structure Buildings

/Steel Framing Prefab Workshops And Warehouses for Machinery Factory

Steel Framing Prefab Workshops And Warehouses for Machinery Factory

Steel Framing Prefab Workshop Warehouse steel building system mainly refers to the main load-bearing components are composed of steel. Including steel columns, steel beams, steel structure foundations, steel roof trusses, and steel roofs. Also the metal cladding systems, including wall system, roof system, lighting system, ventilation system, door and window accessory systems.

  • Payment:

    TT/LC
  • Product Origin:

    Shandong Province, China
  • Color:

    Customized as your request
  • MOQ:

    500 square meters
  • Shipping Port:

    Qingdao Port, China
  • Lead Time:

    30s-45s days after receiving your deposi
  • Product Details

1 Product Parameters:

Product name

Steel Framing Prefab Workshops & Warehouses for Machinery Factory

Main Structure

Weld H steel/ Steel Beam/Column

Sub-Structure

C/Z purlin,C/Z section steel

Roofing&Wall

Fireproof/Insulated sandwich panels or corrugated steel plate

Connect

By bolts

Lighting system

Lighting panel/aluminum alloy window/sliding window/plastic steel window/aluminum window with thermal insulation broken bridge

Ventilation System

Stainless Steel Ventilator

Door

Composite door/sliding door/rolling door/swing door/Industrial lift door

Certificate

CE/ISO9001/ISO14001

Application

Workshop/Warehouse/Storage/Frame/Shed/Any Steel Structure Buildings

2 Steel Structure Installation Process:

Steel Structure Installation Process1

1. Construction line. According to the design requirements and the requirements of the drawings, the theodolite and the level are used for positioning, and after the axis and elevation can be determined, the position of the steel frame footing can be confirmed. 
2. Foundation embedded parts. Before the foundation concrete is poured, the embedded bolts should be fixed according to the size, and the embedded bolts should be wrapped in advance, so as to avoid the pollution when pouring the concrete. After the concrete is poured, it is necessary to clean up the small concrete residues at the pre-embedded bolts and screw openings in time. 
3. Steel column hoisting. First of all, we need to confirm the position of the component lifting point and take appropriate protective measures. After the steel column is lifted, center it near the anchor bolt, align the mounting hole exactly with the bolt, and then slowly lower the hook. After initial calibration, tighten the bolts. 

Steel Structure Installation Process2
4. Steel beam installation. After the re-inspection of the steel column, the steel beam is lifted, and its two points are tied symmetrically. When the steel beam and the steel column datum plane are aligned, the butt adjustment and correction can be performed, and then they are fixedly connected. 
5. Purlin installation. In terms of purlins, the method of one hook and multiple hangs can be used, by moving the sample rod forward and backward along the purlin, adjusting the error by tightening and loosening the bolts, and finally fixing and correcting it with bolts. 

Steel Structure Installation Process3
6. Install the wall panels. It is possible to start mainly from the gable at one end and work your way towards the other end. In the early stage of construction, it is necessary to use the operating platform to make the transition, and ensure that the top plate is parallel and installed vertically through the cable. It is best to shape at one time and handle with care to avoid scratches. 
7. Workshop painting. First wipe off the stains on the metal surface, and then apply the anti-rust paint. After the anti-rust paint dries, start scraping the putty. After the putty is dry, sand it flat. Finally, apply an anti-phosphating primer.

3 Steel Structure Packing&Shipping:

Steel Structure Packing&Shipping

4 Machinery Factory Project Cases:

Machinery Factory Project Cases1

--Machinery Factory Project Cases Of Haomai Machinery

Machinery Factory Project Cases2

--Machinery Factory Project Cases Of Qingdao Haier Drum Washing Machine Intelligent Production Line Base

Machinery Factory Project Cases3

--Machinery Factory Project Cases Of Yantai Runfuxiang Oil Seal Co., Ltd.

Leave a message
If you are interested in any of our products, please feel free to contact us. We are looking forward to your cooperation.

Related Products

Structrual Steel Structure

Structrual Steel Structure Building System

Wiskind offers a multi-layer, low-rise steel construction system that is rugged and practical and adaptable to different building functional requirements; It has the characteristics of clear design concept and fast and accurate processing and installation.

Metal Workshop Buildings

Metal Workshop Buildings for Food Processing Plant

Metal Structures Workshops,are buildings that use an industrialized production method to build a building, and are also buildings that prefabricate some or all of the components of the building in a factory, and then transport it to the construction site to assemble the components through a reliable connection method. It has the characteristics of convenient and quick installation and construction, light weight, large span, good wind and earthquake resistance, good thermal insulation, sound insulation and other outstanding features.

Metal Buildings

Metal Buildings for Logistics Storage Center

The materials used in Metal Buildings have the characteristics of light dead weight and high strength. The dead weight of steel structure buildings is about 30% lower than that of concrete buildings. The advantage of prefabricated steel structure - fast, due to its different construction characteristics, the construction period of steel structure is more than 50% higher than that of PC. The steel structure is light and strong, saving materials; the construction process saves energy, water and land; the material can be disassembled and recycled, and the recycling rate can reach 70%;Well-designed, sophisticated system steel structure, low cost; as labor costs continue to rise, the labor, formwork, materials and other costs of traditional concrete structures are higher than those of steel structures.

Pre engineered Structural Steel Buildings

Pre engineered Structural Steel Buildings for Electronics Industry

Pre-engineered Structural Steel Workshops,as steel structure buildings,have the advantages of wide span, high strength, light weight, low cost, temperature protection, save energy,beautiful appearance, short construction time, good effect of insulation, long using life, space efficient, good seismic performance, flexible layout, etc.

Subscribe Us

Subscribe Us

Please read on, stay posted, subscribe, and we welcome you to tell us what you think.

 
Leave a message Request A Free Quote
If you are interested in any of our products, please feel free to contact us. We are looking forward to your cooperation.