Project Area: 18,000 Square Meters
Steel Structure: 720 Tons
Type of Construction: Large Heavy Steel Industrial Plant
Products and Service: Materials and on-site installation (steel structure, sandwich panels, windows, doors, high-strength bolts and other materials and installation construction)
Signing Date: 6th, December, 2015
Shipment lot: 6 Times
Finish time: 29th, June, 2016